AnsweredAssumed Answered

Update PI tag with AF analyses

Question asked by LSIndK on Mar 14, 2016
Latest reply on Mar 15, 2016 by LSIndK

I have a calculation in AF that  run once a month and the result is written in a pi tag. In some cases the data used to do the calculation change, and the result needs to be updated in the pi tag.

 

Is it possible to update a pi tag value using AF analyses

 

Can I write a result in a pi tag (using AF analyses) specifying the time stamp that I want?

 

Thank you

Outcomes