RJKSolutions

What does the future hold for ACE?

Discussion created by RJKSolutions on Dec 5, 2008
Latest reply on Dec 12, 2008 by RJKSolutions

Will ace be fully integrated into AF so any calculations can be done within AF without the need for the ACE wizard is Visual Studio? I can see that in AF 1.3 Analysis Rules could be scheduled to run with ACE.

 

I have seen a client where a friendly user interface was created for ACE so there was no need for users to have the ACE wizard, I see AF calculations as a nice natural progresion of that.  What is OSI's position on ACE in the future.

Outcomes