Calculated PI Point for 24 Hour Peak

Question asked by cbrunner on Jun 8, 2016
Latest reply on Dec 18, 2016 by rzandvliet

I am trying to create a calculated PI Point that I can display on Processbook (and then coresight). My goal is to create a point that calculates a 24 Hour Peak from another PI point. I know there is this ability in Datalink:

 

PIAdvCalcVal(TagName,Time Start,Time End,"maximum","time-weighted",0,1,0,"")

 

Is there any way to do something similar and create a calculated point that does the same?