AnsweredAssumed Answered

AF to replace a simple ACE calc?

Question asked by srm2 on Sep 1, 2016
Latest reply on Sep 6, 2016 by lposner

Okay folks, I have a fairly simple ACE calculation, that'd I'd like to replace using AF.  The calculation uses 3 inputs and combines them to one output.

 

Time_in

Trigger_in

Value_in

Value_out

 

Time_in is the timestamp we want to use for value_out (from an existing PI tag)

Trigger_in is a value written to a PI tag (lab entry)

Value_in is the value (typically from trigger_in)

Value_out is the value of value_in and the timestamp of Time_in

 

I'm not very literate in VB, this code is VB6, using ACE and the MDB.  Fairly new to AF.  So, is something like this a candidate to move away from ACE?

 

Thanks!

Outcomes