AnsweredAssumed Answered

Calculating Over Part of an Event Frame Duration

Question asked by Steve Boyko Champion on Jun 21, 2018
Latest reply on Jun 22, 2018 by nagarwal

One of our clients is generating event frames to capture a certain process. These event frames average about 15-20 minutes in duration but do not have a fixed duration. They would like to calculate the change in a particular attribute for the last 25% of the event frame's duration.

 

I know that you can use TimeRangeOverride and the RelativeTime attributes of a data reference to use a portion of the duration for a calculation's time range, but this is a fixed duration. As an example, this gives the delta (difference) for an attribute over the last 3 minutes of the event frame.

Is there a way to do this over a percentage of the event frame's duration instead?

Outcomes