Water System Demand Curves in AF

Discussion created by pvinverse on Jun 24, 2019
Latest reply on Jul 16, 2019 by Jarita Sirois

Does anyone have experience creating demand curves for a water system using mass balance in asset framework? I'm particularly interested in the methodology of the mass balance vis a vis sampling times and calculation methods. Presently, I'm calculating the volume change using the following configuration:

  • Analyses to average flow rate from inflows and outflows over a 15 minute interval sampled periodically every 5 minutes
  • Analyses that sum child attributes to the level of a pressure zone sampled periodically every 5 minutes (avoiding rollups that can't be backfilled)
  • A final analysis at the pressure zone level that performs the mass balance sampled periodically every 5 minutes

 

I'm hoping to begin a discussion on what works well for others and 