Hello everybody

 

Is there any procedure to do backfilling, when the analysis need as input, the outputs of the previous calculation?

I think the actual backfilling procedure works as an analysis, first read all the inputs (across the time interval), then perform the calculations in all of them in the same time, and finally write all the outputs, regardless of the dependency between inputs and outputs.

 

I have an analysis, where some calculation depend on previous results, and I need to do backfilling. Somebody knows how can I will do the backfilling in this case?

 

Thank you in advance

 

 