AnsweredAssumed Answered

equipment uptime calculation

Question asked by cyberterrorist on Aug 25, 2019
Latest reply on May 15, 2020 by cyberterrorist

I have two digital PIPoints (1 - on, 0 - off), one point is for status of production unit and second one is for status of equipment, which is part of this production unit. I need to put percentage of uptime based on calendary months for this equipment to PIPoint. Equipment uptime should be calculated only when production unit is on. What is the most efficient way to do this in AF?

Outcomes